Medium-capacity Horizontal Jack Disassembly Bench

Equipment normal inspection requirements

1. Install elements in accordance to the drawings and prepare pipelines in accordance with specifications
2. Close the essential oil circuit end valve earlier than maintenance
3. Keep the working floor clean
4. Check the torque of fasteners each and every three months
5. Establish a seal file and change it regularly
6. Clean the filter each 15-30 days and the hydraulic cylinder each 6-10 months
7. Clean the oil tank each six months and preserve the pipeline annually
8. Replace the filter aspect at once if it is blocked
9. Regularly calibrate the measuring instruments
10. Maintain the digital manage tools in accordance to the instructions

Contact Now E-Mail Telephone
Product Details

Equipment regular inspection specifications


1. System installation requirements

All hydraulic components must be positioned and installed strictly according to the requirements of the drawings, and the pipelines must pass through the designated pipe rings in accordance with the specifications.

2. Safety operation specifications

During maintenance, the main oil supply line stop valve must be closed to ensure that the system is in a safe state.

3. Cleaning management standards

During the operation, the cleanliness of components, pipelines and interfaces must be maintained to prevent contaminants from entering the system.

4. Fastener maintenance

Torque check of all fasteners every 3 months, uniform force to the specified torque value, and U-shaped cards must be installed on the insertion port to ensure reliable connection.

5. Seal management

Establish a full life cycle file for seals, and replace them according to material properties, use environment and life cycle.

6. Hydraulic component maintenance

Pump body filter is cleaned/replaced every 15-30 days; hydraulic cylinder is disassembled and maintained every 6-10 months; failed springs and other force-bearing parts are replaced in time; working media are replaced according to working condition monitoring.

7. System cleaning cycle

The oil tank valve plate is cleaned and inspected every 6 months; the pipeline is cleaned and maintained every year; the high-pressure hose is replaced compulsorily according to the use cycle.

Medium-capacity Horizontal Jack Disassembly Bench

8. Filter element replacement standard

The filter element of the oil filter is replaced immediately if it is blocked. Once the pressure difference increases or the filtering efficiency decreases, it is replaced immediately.

9. Measuring instrument management

Pressure gauges, sensors and other measuring devices are calibrated regularly according to the calibration cycle to ensure measurement accuracy.

10. Electrical component maintenance

Electronic control equipment is operated and maintained strictly in accordance with the requirements of the manual, and illegal use is prohibited.


Leave your messages

Related Products

x

Popular products

x
x